The most important points in the process of interior decoration

Source:-- Addtime::2020-05-08  Hits: 759

 The concealed engineering in office building decoration refers to the pipeline engineering and structural engineering concealed inside the decoration surface.

Pipeline engineering includes electrical circuit, water supply and drainage, computer room pipeline, air conditioning system, etc.; structural engineering refers to the internal structure used to fix and support the load.

Of course, except for the modern industrial wind. Industrial wind is not like other styles to hide basic equipment such as pipes, but to expose these hidden equipment to show the most original ecological side.

But not all office decoration will choose modern industrial style, so we need to pay attention to the quality of concealed works is a common problem.

According to the decoration process, these "concealed works" will be covered by the later process, so it is difficult to check whether the materials meet the specifications and whether the construction is standardized. Concealed works refer to the works laid inside the decorative surface.

Moreover, due to the inconvenience of maintenance, there are many hidden dangers left by the unqualified construction of hidden projects. Therefore, it is necessary to understand its structure and materials. The concealed works of office building decoration mainly include six aspects:

Water supply and drainage engineering

In drainage engineering, the selection of pipeline materials is particularly important. The galvanized pipes on the market before will be gradually eliminated due to their non thermal insulation, easy rusting and scaling. At present, the pipes with good plasticity and toughness are widely used, with the advantages of temperature resistance and non scaling.

2、 Electrical pipeline engineering

3、 General power line is divided into hard wire, soft wire, sheath wire, etc. For the sake of safety and for the convenience of maintenance, the power line should be covered with the pipe. The sockets are divided into 10a, 15a, etc. The choice of socket is not a big problem, the quality is OK.

4、 The floor is divided into solid wood floor and composite floor.

5、 Whether it is solid wood floor or composite floor, the base course must be based on the premise that the ground is flat, solid, strong enough and the surface is dry. The floor base is related to the quality of the whole floor decoration and the comfort of living in the future. Therefore, floor base treatment is very important. Before the ground construction, it is necessary to understand the situation of the foundation, the nature of the foundation, the material type, etc., so as to formulate the corresponding construction scheme.

 4、 Parapet base

5、 There are two types of dado: flat type and concave convex type. During construction, the following requirements shall be followed:

The wood type, specification and grade of the wood shall be in accordance with the requirements of the design drawings, and the construction shall be in accordance with the regulations: the skeleton material is generally dried with red and white pine, the moisture content is more than 12%, the thickness shall be in accordance with the design requirements, and there shall be no rot, knots, splits, twists and other defects. And pre treated with anti-corrosion.

5Door and window base

The keel shall be arranged first, then the joinery board or density board shall be nailed, and the surface shall be nailed with veneer plywood. Note that the density board notice should be soaked in water to avoid future expansion.

6Ceiling base

Ceiling materials include gypsum board, plywood, aluminum alloy gusset plate, plastic gusset plate, etc., and keel includes wood keel and light steel keel.

After the completion of the concealed works, careful acceptance shall be carried out to ensure that no hidden dangers are left, and subsequent construction can only be carried out after the acceptance is qualified. Otherwise, problems found in the future need to be reworked, which will not only affect the quality and safety, but also delay the construction period.

The quality of concealed works must not be underestimated in office decoration. In any case, it is a safety related issue, so please choose a professional decoration company when decorating.

 

NEWS